Project Proposals

COLLECTION SYSTEM & WASTEWATER TREATMENT AND RECLAMATION FACILITY

The Wastewater Reclamation Project’s Phase 1 is composed of a collection system, which is broken into four construction packages, A through D, along with a Wastewater Treatment and Reclamation Facility.  Hi-Desert Water District (HDWD) is currently in the process of seeking contractors, as well as subcontractors to construct these project components.

COLLECTION SYSTEM

Proposals and Qualifications

All contractor prequalifications have now closed for Phase 1 of the collection system.

Bid Information

Below is bid information for each identified package of the collection system:

Package B (Pump Stations):  The bidding process for this package is tentatively schedule to open in March 2017.

Package A: The prequalification and bid process is closed. The District has awarded Sukut Contractors to install Package A of the collection system.

Bid documents:

Package C: Bid opening to be announced.

Package D: Bid opening to be announced.

Please submit all questions via email to markb@hdwd.com.

WASTEWATER TREATMENT AND RECLAMATION FACILITY

Subcontractors interested in providing services for the construction of the Wastewater Treatment and Reclamation Facility, please contact W.M. Lyles Co. Contractor at www.wmlyles.com for more information.

PROJECT REFERENCE DOCUMENTS

Initial Study/Environmental Assessment

Initial Study/Environmental Assessment (Table)

Adopted Mitigated Negative Declaration

Notice of Completion and Environmental Document Transmittal (Addendum 1)

Adopted Mitigated Negative Declaration (Addendum 2)

Covington Wash Floodplain Study and Alternative Analysis (Final Report), January 2013

Covington Wash Floodplain Study and Alternative Analysis (Final Report), October 2015 

Preliminary Geotechnical Engineering Evaluation

Percolation Test Summary

FEMA Flood Map West

FEMA Flood Map East

Topographic Map of Wasterwater Treatment Plant and Covington Wash Survey

Collection System Schematic

Final 2014-1 Assessment Engineer’s Report Signed

Preliminary Project Schedule